- Project Name: Kirtipur Nagarpalika Tyanglaphat Water Supply Project
- Location: Kirtipur, Nepal
- Year: 2020
- Task Assignment: Detail Design
- Client: Ministry of Physical Infrastructure Development Water Supply and Sanitation Division No 5
- Project Status: Completed
The basic objectives of the project include the followings:
* Design water supply pipe network
* Identification of necessary treatment units with clear justification
* Support community participation in the development of water supply & sanitation facility.
* Prepare necessary working drawings, quantity and cost estimate
- Project Name: Brihat Khanepani Yojana Kirtipur 1, 2, 9
- Location: Kirtipur, Nepal
- Year: 2020
- Task Assignment: Basic Design
- Client: Ministry of Physical Infrastructure Development, Water Supply and Sanitation Division No 5
- Project Status: Completed
Basic Design of the water treatment system was done in cooperation with PowerTree Pvt. Ltd.
* Identification of necessary treatment units with clear justification
* Support community participation in the development of water supply & sanitation facility.
* Prepare necessary working drawings, quantity and cost estimate
- Project Name: Valuation of Hattiban Height Resort
- Location: Nepal
- Year: 2017
- Task Assignment: Valuation of structures
- Client: Hattiban Resort Pvt. Ltd.
- Project Status: Completed
Aabiral completed the valuation of Hattiban Height Resort. The quantity estimates and drawings were prepared along with rate analysis and cost estimates
- Project Name: Damaichaghat Drinking Water Supply Project
- Location: Kathmandu, Nepal
- Year: 2020
- Task Assignment: Detail Design
- Client: Ministry of Physical Infrastructure Development
- Project Status: Completed
Detailed Engineering Design of the water treatment system was done in cooperation with PowerTree Pvt. Ltd.
1. Review of reports for the collection of the relevant information
2. Conduct a detailed engineering survey of water supply systems proposed for the community' with due
consideration of the existing water supply facilities;
3. Prepare a detailed engineering design, working drawings, cost estimates.
4. Consideration of the environmental or ecological impact of the project.
5. Identify the item of work to be carried out by water users in terms of their contribution and
separate them from items to be included under the contract
- Project Name: Parwat Water Supply
- Location: Parwat District, Nepal
- Year: 2017
- Task Assignment: Desing of Water Supply Filter System
- Client: Parwat Muncipality
- Project Status: Ongoing
Main assignment of this projects are:
1. Survey and design of Water Treatment Plant at Falebas, Parbat
2. Conventional system design (Rapid Sand Filter in Scheme 1 and Slow Sand Filter in Scheme 2)
3. Draft Design submitted on 25 Ashar